Two semesters of prototyping and mechanical product design. Two standout labs: a 4-bar linkage toss launcher built around a class competition, and a load-bearing tower designed, tested and presented in a written officer's report. Competition format forced real tolerance and repeatability on both.
4-bar linkage launcher
Iterated from a weak first prototype to a final build that held its own against the class. Each video shows a step in the prototyping arc.
IMG_0023.mp4
IMG_9615.mov
IMG_9619.mov
Lab 5 - Stedman, Hollande, Maniscalco
Load-bearing tower
Designed a truss tower to carry as much load as possible, then tested it under a progressive load until failure. Wrote and presented the officer's report for the team.
IMG_0236.mp4
IMG_0247.MOV
LAB 2 – Tower Officer’s Report - MEAM 247

