CédricHollande

Mechanical Engineering

Sophomore Year

Two semesters of prototyping and mechanical product design. Two standout labs: a **4-bar linkage toss launcher** built around a class competition, and a **load-bearing tower** designed, tested and presented in a written…

Competition

Two semesters of prototyping and mechanical product design. Two standout labs: a 4-bar linkage toss launcher built around a class competition, and a load-bearing tower designed, tested and presented in a written officer's report. Competition format forced real tolerance and repeatability on both.

4-bar linkage launcher

Iterated from a weak first prototype to a final build that held its own against the class. Each video shows a step in the prototyping arc.

Media unavailable

IMG_0023.mp4

IMG_9615.mov

IMG_9619.mov

Lab 5 - Stedman, Hollande, Maniscalco

Open Lab 5 - Stedman, Hollande, Maniscalco

Load-bearing tower

Designed a truss tower to carry as much load as possible, then tested it under a progressive load until failure. Wrote and presented the officer's report for the team.

IMG_0236.mp4

IMG_0247.MOV

LAB 2 – Tower Officer’s Report - MEAM 247

Open LAB 2 – Tower Officer’s Report - MEAM 247
Tower testing
Tower testing